Pricing

One contract,
sized per cluster.

Every cluster follows the same contract shape. What changes is the size, the region and how fast it ramps.

Reference rate
FromUS$3.50/ GPU-hour

NVIDIA HGX B300 on a 60-month term. The rate is quoted per deal: size, region and how much you prepay lower it.

Every proposal includes
  • Cluster size and wave schedule
  • Region and Tier III facility
  • Network design
  • Operating and support terms
  • Your exit and rollover terms
HGX B200
FromUS$3.00/ GPU-hour
8 GPUs per node180 GB HBM3e per GPU
GB200 NVL72
FromUS$4.00/ GPU-hour
72 GPUs per rack186 GB HBM3e per GPU
GB300 NVL72
FromUS$5.00/ GPU-hour
72 GPUs per rack288 GB HBM3e per GPU
VR200 NVL72Waitlist
FromUS$6.50/ GPU-hour
72 GPUs per rack288 GB HBM4 per GPU

All rates are from-rates per GPU-hour on 60 months, prepaid. VR200 NVL72 is a waitlist for first allocation, not available capacity.

Hardware

NVIDIA hardware available to reserve.

Clusters run on NVIDIA Blackwell today. Rollover is how a contract gets to what comes after.

Reference GPU

NVIDIA HGX B300

Eight Blackwell Ultra GPUs per node with 288 GB of HBM3e each, reserved by the node. Root on every node in bare metal mode.

8 GPUs per node288 GB HBM3e per GPUabout 10 to 14 weeks from signingRoCE v2
Rack scale

NVIDIA GB300 NVL72

72 Blackwell Ultra GPUs and 36 Grace CPUs in one rack, as a single NVLink domain with 20.7 TB of memory.

72 GPUs per rackLiquid cooledWhole racks only
Next generation

NVIDIA Vera Rubin

VR200 NVL72 is on the waitlist for first allocation. Once it ships, it is also the generation that part of an existing commitment can roll into.

WaitlistFirst allocationRollover target
Standard terms

The same terms for every cluster.

Size, region and ramp are set per deal. The contract structure is the same.

Term
60 monthsThe only term. There are no shorter ones.
Minimum size
8 HGX nodes (64 GPUs) or one NVL72 rack (72 GPUs)Most clusters are 32 to 128 nodes; larger ones are scoped case by case. NVL72 is reserved as whole racks.
Delivery
Large clusters in monthly waves of 32 nodesHGX B300 about 10 to 14 weeks from signing. Dates are always counted from signing.
Exit
Option in the contractYour proposal sets the terms.
Rollover
Into a newer GPU generationPart of the commitment can move into a newer GPU generation when it ships.
Prepayment
Required, held in escrowIt is paid into escrow with an independent escrow agent, which releases it in stages as supply, installation and acceptance milestones are met. From the first full month, it is credited in equal parts against each monthly invoice over the term. There is no security deposit.
Transfer
Possible with Lightyard's consent
Network
RoCE v2 Ethernet, spine-leafNon-blocking on request.
Facilities
Tier III, in the region you chooseUS West, US Central, US East, Europe, East Asia, Southeast Asia and South America
Operation
Bare metal or managedSame single-tenant hardware either way. We monitor it, replace failed parts and run it to an SLA.

Hourly capacity

We work best on committed, long-term capacity. If you need GPUs by the hour or month to month, this isn't the right contract. Tell us what you need and we'll point you in the right direction.

Pricing questions

Before you ask for a proposal.

Anything else on pricing, ask. We usually reply within a few hours.

Get started

Start with one rack.

Tell us the size and timing you have in mind. We usually reply within a few hours and come back with a written proposal.

sales@lightyard.ai